Recommended basic settings for Pakistan home energy storage systems (Solar → Battery → Grid priority logic).

LED Indicators & Status Descriptions
①AC Indicator (Green)
- On: GRIDpower normal, inverter operating on GRID
- Flashing: GRIDpower normal, unit not operating on GRID
- Off: GRIDpower abnormal.
②Inverter Indicator (Yellow)
- On: Output powered by batteries or PV in battery mode.
- Off: Other operating statuses.
③Charging Indicator (Yellow)
- On: Battery under float charging.
- Flashing: Battery under constant-voltage charging.
- Off: Other operating statuses.
④Fault Indicator (Red)
- On: Inverter malfunction.
- Flashing: Inverter warning alarm triggered.
- Off: Inverter operating normally.

1, How to Enter Setting Mode
- Press and hold the ENTER button for 2 seconds.
- Use UP / DOWN buttons to select the setting item.
- Press ENTER to confirm.
- Press ESC to exit the menu.
2. Recommended Basic Settings
| Function | Program No. | Recommended Setting | Description |
| Output Priority | 03 | SBU / PGB | Solar first, then Battery, then Grid |
| BMS Communication Function | 44 | PLY(Hua Power Battery) | OFF default
CVT: CVTE protocol (485) PYL: PYLON protocol (485 and CAN)-HUAPOWER Battery GRO: GROWATT protocol (485 and CAN) VOL: VOLTRONIC protocol (485) IRO: China Tower protocol (485) PAR: PACE RTU protocol (485) |
| Charging Priority | 05 | PNG | Solar charging first, grid assists when needed |
| Battery Type | 17 | FEL / Lithium | Select lithium battery mode |
| BMS Communication | 44 | ON | Enable lithium battery communication |
| Grid Charging Current | 06 | 20A ~ 40A | Recommended for home systems |
| Maximum Charging Current | 07 | 80A ~ 120A | Depends on battery capacity |
| Low SOC to Grid | 48 | 10% | Switch to grid when battery is low |
| High SOC to Battery | 47 | 90% | Return to battery mode automatically |
Program NO 06 reference:
| Battery capacity | Suggestion Current |
| 100Ah | 20A |
| 200Ah | 40A |
| 300Ah | 60A |
Program NO 07 reference:
| Battery capacity | Suggestion Current |
| 100Ah | 50A |
| 200Ah | 100A |
| 300Ah | 120A |
3. Recommended Working Logic
- Solar power supplies the load first.
- If solar power is not enough, battery power will support the load.
- If both solar and battery are insufficient, the inverter switches to grid power automatically.
4. Important Notes
- Always enable BMS communication for lithium batteries.
- Do not select AGM mode for lithium batteries.
- Avoid setting charging current too high to protect battery life.
- PNG mode is the most stable setting for Pakistan market applications.
5. Quick Explanation for Customers